MAJOR REMODEL — FOR SUBSTANTIAL RENOVATIONS AND COMPLEX RESIDENTIAL PROJECTS

Stay in Control of the Decisions That Shape Your Major Remodel

The Major Remodel Decision System™ is an in-depth homeowner decision system designed for substantial renovations where planning, design, contracts, budgets, selections, documentation, payments, and construction all have to stay aligned.
Built from more than 45 years of construction experience, the system expands the foundational BYSA methodology into a deeper, project-long process for navigating existing-condition uncertainty, allowances and contingencies, scopes and change orders, progress payments, lien releases, construction coordination, and final closeout.
You do not need to become the contractor. You need a reliable system for knowing what deserves attention, when a decision needs to be made, what should be documented and verified, and when to pause before you sign, approve, change, or pay.

One-time payment — Immediate digital access

One-time payment — Immediate digital access
You do not need to become the contractor. You need a reliable system for knowing what deserves attention, when a decision needs to be made, what should be documented and verified, and when to pause before you sign, approve, change, or pay.

MAJOR REMODEL — FOR SUBSTANTIAL RENOVATIONS & COMPLEX RESIDENTIAL PROJECTS

Stay in Control of the Decisions That Shape Your Major Remodel

The Major Remodel Decision System™ is an in-depth homeowner decision system designed for substantial renovations where planning, design, contracts, budgets, selections, documentation, payments, and construction all have to stay aligned.

Why Learn From Paul

Real residential construction experience

Hands-on experience building and managing projects

Practical planning and risk-management guidance

Experience serving as an expert witness in construction disputes

MAJOR REMODEL. MORE MOVING PARTS. MORE CONSEQUENTIAL DECISIONS.

A Major Remodel Changes More Than Your Home

Unlike a smaller residential project, a major remodel requires new work to be planned, designed, priced, and built around an existing structure. Conditions may be hidden, selections affect other trades, changes can ripple through the schedule, and financial decisions continue long after the contract is signed.
As the homeowner, you are still the person making or approving many of the decisions that shape the project:
You do not need to manage the construction yourself. But on a major remodel, you do need a reliable way to stay informed and organized as those decisions accumulate.

The cheapest moment to fix a mistake is before it happens. That’s the entire reason this exists.”

Paul Johnson, Founder of Before You Sign Anything™

Approving Changes Before the Full Impact Is Understood

On a major remodel, one change can affect materials, multiple trades, sequencing, cost, and timing. Before work proceeds, understand what is changing, why it is changing, what it will cost, and how it may affect the schedule.

Releasing Progress Payments Ahead of Verified Progress

Payments should move at approximately the same pace as documented, completed work. Paying too far ahead can reduce financial leverage while leaving questions about unfinished work, supporting documentation, lien releases, or other payment requirements.

Designing Before Priorities and Budget Are Clear

When design moves ahead of clearly defined needs, priorities, constraints, and budget parameters, homeowners can spend time and money developing a project they later have to redesign, reduce, or reconsider.

Proceeding With Incomplete Scope, Specifications, or Allowances

A proposal can appear complete while important assumptions remain unresolved. Missing scope, vague specifications, and unrealistic allowances can surface later as change orders, delays, or unexpected budget pressure.

Four Common Mistakes

That Can Become Expensive

Consider a Different System if…

Major Remodel Is Designed for You If…

CLIENT EXPERIENCES

Decades of Experience. In Their Words.

Hear from homeowners and professionals who have worked with Paul Johnson and experienced his approach to construction planning, communication, and documentation firsthand.

MOVE FORWARD, MORE PREPARED

What You Will Be Better Prepared to Do

After Working Through the Major Remodel Decision System™, You Will Be Better Prepared To:

Put What You Learn Into Action

Make More Informed Major Remodel Decisions

The goal is not to eliminate every possible project problem.
The goal is to help you recognize the decisions that deserve closer attention while there is still time to address them.

What 's inside

The Complete Major Remodel Decision System™

Not simply a longer guide. A connected, project-long decision system built for the added complexity of a substantial renovation. From early planning and design through contracts, financial control, construction, and final closeout, each part of the system is designed to help you make more informed decisions at the moments that shape the project.

254

PAGE GUIDE

10

CHAPTERS

7

FOUNDATION DEEP DIVES

12

PROJECT TOOLS

6

ACTION PHASES

Major Remodel includes the foundational decision methodology and core concepts contained in Homeowner Essentials, then takes you substantially deeper into the planning, design, financial control, construction, and closeout decisions specific to a major renovation.

Homeowner Essentials Foundation

Core BYSA decision methodology, frameworks, tools & action planning

Major Remodel Deep Dives

Seven stages of substantial–renovation planning, control & execution

3 SIGNATURE CONCEPT

Learn to recognize the period when an important construction decision is still relatively easy to address — before plans are finalized, products are ordered, walls are closed, changes are performed, or payments are released.

The system helps you identify those moments before the same decision becomes more difficult, disruptive, or expensive to change.

2 FOUNDATION DEEP DIVES

Go substantially deeper into the decisions that shape each stage of a complex renovation:

1 Core Guide

A project-long guide built specifically for substantial renovations, taking you from early planning and design through contractor selection, contracts, financial control, construction, and final closeout.

6 ACTION PLAN

Turn what you learn into a chronological process for organizing the questions, documents, conversations, decisions, and next steps that may need your attention.
Rather than finishing the system and wondering what to do next, the six-phase structure helps you move from learning into application.

5 FINANCIAL CONTROL

1 Document

Understand what the payment covers and what supporting documentation should accompany it.

2 Verify

Confirm the associated work, materials, milestone, and other relevant requirements.

3 Pay

Release payment after the first two sides of the triangle have been appropriately addressed.
Applied throughout the system to progress payments, lien documentation, retainage, and final payment.

4 TOOLKIT

Use practical tools throughout the remodel to help organize information, compare options, document decisions, and manage important milestones:
  • Contractor Interview Worksheet™
  • Contractor Comparison Matrix™
  • Project Document Checklist™
  • Budget Planning Worksheet™
  • Scope Clarity Checklist
  • Contract Protection Checklist
  • Insurance Verification Guide
  • Schedule Awareness Tracker
  • Change Order Log™
  • Meeting Notes™
  • Payment Protection Triangle™ Worksheet
  • Final Walkthrough Checklist™

7 IN EVERY CHAPTER

Every major chapter is designed to move you from understanding into application. BYSA Decision Reviews™ help you reconsider what you know and what remains unclear. BYSA Action Plans™ turn the chapter into tangible next steps. Decision Checkpoints™ give you a deliberate place to pause before moving forward. Together, they help make the system something you actively use throughout the remodel — not simply something you read.

Everything above, in one download.

BONUS — INCLUDED FREE

The Bonus Resource Collection

Nine real-world sample documents and guides, so you can see how construction paperwork is actually written, tracked and filed.
THE COLLECTION

6 Submittal Log

7 Construction Allowances Guide

8 Construction Financial Documentation Guide

9 Sample Project Schedule

1 Sample Contract Terms

2 Partial Lien Release Sample Terms

3 Partial Final Lien Release Sample Terms

4 ACORD Insurance Declarations Sample

5 Product Submittal Sample

USE THE SYSTEM AT THE MOMENTS THAT MATTER

From Early Planning Through Final Closeout

Major Remodel is designed to stay with you through the decisions that shape a substantial renovation — not simply be read once and set aside.

1 | Before Design Moves Too Far

Establish what the project actually needs to accomplish before plans and selections begin driving the budget. Separate needs from wants and wish-list items, consider existing-condition uncertainty, establish realistic budget parameters, and create room for contingency.
Use the Opportunity Window™ to address important questions while changes are still easier to make.
Inside the System:
Budget Planning Worksheet™
Construction Allowances Guide

2 | As Plans, Specifications, and Selections Take Shape

Look beyond floor plans and elevations to the details that tell the contractor what is actually being built. Review specifications, allowances, product selections, submittals, and owner-supplied items before assumptions turn into changes during construction.
Inside the Product:
Product Submittal Sample
Submittal Log
Construction Allowances Guide

3 | Before You Choose a Contractor and Sign

Compare more than the bottom-line price. Review whether proposals are based on comparable scopes, clarify exclusions and responsibilities, verify insurance, and understand the contract procedures that will govern payments, changes, scheduling, and communication.
Inside the System:
Sample Contract Terms
ACORD Insurance Declarations Sample
Sample Project Schedule

4 | Before Construction Begins

Set expectations before the first tool arrives. Use the preconstruction process to clarify working hours, access, parking, work zones, communication, site protection, dust containment, pet safety, temporary living arrangements, and other realities of remodeling an occupied home.
Then keep those expectations organized as construction gets underway.
Inside the System:
Schedule Awareness Tracker
Meeting Notes™

5 | As Changes, Milestones, and Progress Payments Arrive

Major remodel decisions do not stop when construction starts. Document proposed changes before the work proceeds, understand their cost and schedule impact, and evaluate progress payments against the work, documentation, lien releases, and other requirements supporting the invoice.
Apply the Payment Protection Triangle™: Document. Verify. Pay.
Inside the System:
Change Order Log™
Construction Financial Documentation Guide
Partial Lien Release Sample Terms
Payment Protection Triangle™ Worksheet

6 | Before You Accept Completion and Release Final Payment

Do not confuse substantial completion with complete closeout. Walk the project systematically, document unfinished or deficient items, confirm required inspections and closeout materials, address retainage where applicable, and review final lien documentation before the last payment is released.
Inside the System:
Final Walkthrough Checklist™
Final Lien Release Sample Terms

This is not a system you read once and forget.
Return to it before plans become harder to change, products are ordered, contracts are signed,
construction begins, changes are performed, progress payments are released, and final completion is accepted.

MAJOR REMODEL

Decision System™

$149

ONE-TIME PAYMENT

254 Pages

Ten-chapter major remodel decision system

7 Foundation Deep Dives

From planning and design through construction and closeout

12 Project Tools

Practical tools for organizing decisions throughout the remodel

9 Bonus Resources

Sample documents and construction guides

Immediate Digital Access

Start using the system right away

One-time payment • Immediate digital access

A SMALL INVESTMENT ATTACHED TO A MUCH LARGER RENOVATION

Spend More Time Reviewing the Decisions That Govern Your Major Remodel

Homeowners can spend weeks researching cabinetry, appliances, flooring, fixtures, tile, and finishes. Those choices matter.
But on a major remodel, decisions about scope, allowances, contingencies, changes, documentation, progress payments, and project closeout can affect far more than a single selection.
And many of those decisions become harder—or more expensive—to revisit once design advances, products are ordered, work is performed, or money has been released.
On a substantial renovation involving tens or hundreds of thousands of dollars, $149 is a small investment in a clearer process for reviewing those decisions before the opportunity to address them has passed.
ANY ONE OF THESE SITUATIONS COULD COST
SUBSTANTIALLY MORE THAN THE SYSTEM ITSELF.
ANY ONE OF THESE SITUATIONS COULD COST SUBSTANTIALLY MORE THAN THE SYSTEM ITSELF.

One Progress Payment Released Too Soon

Money moving ahead of verified work, documentation, or required lien releases—reducing the homeowner’s financial leverage while questions remain unresolved.

One Unrealistic Allowance

A placeholder that looks reasonable during estimating but proves insufficient once actual products, quantities, or selections are finalized.

One Missing Scope Item

A responsibility, exclusion, or piece of work that was never clearly defined and later appears as an unexpected change or added cost.

Major Remodel helps you recognize the decisions that deserve another look while there is still time to review, clarify, document, or verify them.

REAL CONSTRUCTION EXPERIENCE

Paul Johnson has spent more than four decades building and managing construction companies, leading residential projects, consulting on project planning and risk, and serving as an expert witness in construction disputes.
That experience has given him two different views of construction. He has seen what helps projects succeed while they are being planned and built. He has also seen what happens when unclear contracts, missing documentation, poorly structured payments, misunderstood allowances, and verbal agreements later become disputes.
Before You Sign Anything™ was created to help homeowners learn from those recurring patterns before they face the same consequences themselves.
The guidance inside Major Remodel is not based on theory or generic home improvement advice.

It is based on practical construction experience and the recurring decisions Paul has seen homeowners struggle to navigate.

“Most homeowners only build or remodel a few times in their lives. They should not have to discover the most important questions after the contract is signed or the money has already been released.”

Paul Johnson

Founder, Before You Sign Anything™

BUT PAUL, I TRUST MY CONTRACTOR...

Trust is one of the most valuable ingredients in a successful construction project. Documentation does not replace trust. It helps protect it.

People Rotate

Project managers, subcontractors, and roles may change as work moves forward.

Selections Evolve

Fixtures, finishes, quantities, and details may change during the project.

Materials Change

Products become unavailable, substitutions happen, and assumptions shift.

Conversations Get Forgotten

What felt clear at the time may be remembered differently months later

It is built on preparation.

Trust the people you have chosen. Document the decisions you make together

Documentation Protects Good Relationships From Bad Misunderstandings.

Contracts, schedules, change orders, payment records, specifications, and written decisions give both homeowner and contractor a shared point of reference. Two honest people can remember the same conversation differently months later.

Before You Sign Anything™ isn’t project management software, it is designed to compliment your contractors management system.

YOUR CONTRACTOR'S SOFTWARE

Your contractor's software

JobTread, Procore, Buildertrend, and similar project management software are great tools for your contractor — managing schedules, tasks, documents, communications, crews, and day-to-day coordination.

YOUR ADVANTAGE

Before You Sign Anything™ helps you navigateyour role as the homeowner.

This system is designed to help you make the decisions that are yours to make: what to ask before you sign, what to look for in a change order, what to verify before approving a payment, and what to document along the way.

The two systems serve different purposes,
and they compliment each other.
Your contractor manages the project. Before You Sign Anything™ helps you stay informed, organized, and prepared for the decisions that come with it.

One-time payment — Immediate digital access

A NOTE FROM PAUL

After more than 45 years in construction, one lesson has remained consistent:
Many of the most expensive project problems begin with a question that was never asked, an expectation that was never clarified, or a decision that was never documented.
I created Before You Sign Anything™ because homeowners should not have to learn those lessons after the contract is signed, the money is released, or the disagreement has already begun.
You do not need to know everything about construction.
You need to recognize the decisions that matter and know when to slow down, ask another question, document the answer, or seek qualified professional guidance.
Major Remodel was created to give you a clearer process for navigating those decisions throughout a substantial renovation.
The best time to prepare is before the next decision becomes expensive.

Build Well !
Paul Johnson

Paul Johnson
Founder, Before You Sign Anything™

Ready to Move Forward More Prepared?

$149

ONE-TIME PAYMENT

Major Remodel System - $149