CUSTOM HOME & HIGH-VALUE PROJECT - FOR GROUND-UP HOMES & COMPLEX RESIDENTIAL PROJECTS
Make Better-Informed Decisions From Property Selection Through Final Closeout
One-time payment – Immediate digital access
CUSTOM HOME & HIGH-VALUE PROJECT - FOR GROUND-UP HOMES & COMPLEX RESIDENTIAL PROJECTS
Make Better-Informed Decisions From Property Selection Through Final Closeout
Why Learn From Paul
45+ Years in Construction
Builder
Construction Consultant
Expert Witness
CUSTOM HOME. EARLIER DECISIONS. GREATER FINANCIAL EXPOSURE.
A Custom Home Begins Long Before Construction Does
- You need to understand the property and site conditions before major commitments are made.
- You need to establish priorities and budget parameters before design moves too far
- You need to understand how your architect, builder, engineers, designer, and specialty professionals will coordinate.
- You need to evaluate contracts, allowances, contingencies, changes, and major financial commitments as the project develops.
- And you need to know what should be documented and verified before important milestones and payments are approved
A custom home may involve experienced professionals at every stage. But no one professional is responsible for making every decision on the homeowner’s behalf.
You need a reliable way to stay informed, organized, and prepared as those decisions build on one another.

The cheapest moment to fix a mistake is before it happens. That’s the entire reason this exists.”
Paul Johnson, Founder of Before You Sign Anything™
Coordinating Specialty Systems And Long-Lead Decisions Too Late
Pools, automation, generators, elevators, large-format windows, specialty rooms, and other complex features can affect design, engineering, structure, utilities, and sequencing. Late coordination can create avoidable changes, delays, and added cost
Advancing Design Before Priorities, Budget, And Site Constraints Are Aligned
Design can move quickly once a team is assembled. If project priorities, budget parameters, site limitations, and major requirements are not aligned early, homeowners may pay to redesign or reconsider decisions later.
Purchasing Property Before Site Due Diligence Is Complete
A desirable lot can carry costly constraints. Soils, drainage, utilities, septic, easements, setbacks, topography, and other site conditions can materially affect what can be built and what the project may ultimately require.
Releasing Progress Payments Ahead Of Verified Progress
Significant payments may be tied to milestones, schedules of values, stored materials, lien documentation, or completed work. Paying ahead of adequately documented and verified progress can reduce financial leverage while important questions remain unresolved.
Four Common Mistakes
That Can Become Expensive
Consider a Different System if…
- You are planning a smaller kitchen, bathroom, roofing, flooring, window, outdoor living, or other more limited residential project
- You are planning a substantial renovation, addition, or whole-home remodel centered primarily on modifying an existing structure
- Your project is already facing serious delays, stop-work conditions, major payment disputes, poor workmanship, or escalating contractor conflict
- You need individualized legal, architectural, engineering, financial, or other professional advice specific to your project
- You are looking for architectural or design plans, construction-management services, or instructions for performing the construction work yourself
Custom Home & High-Value Project Is Designed for You If…
- You are planning a ground-up custom home or high-value residential project
- You are evaluating property or land and want to better understand site conditions, development requirements, and potential constraints before making major commitments
- You are preparing for—or already working through—architectural design, engineering, and coordination among multiple professionals
- Your project involves significant budgets, allowances, contingencies, specialty features, or long-lead selections that need to stay coordinated
- You are comparing builders, contract structures, pricing approaches, insurance, or other major financial and project requirements
- Construction has already begun, but important selections, changes, milestone decisions, payments, verification, and closeout still remain
- You want a comprehensive decision system that follows the project from property and site decisions through design, construction, final closeout, and long-term stewardship
CLIENT EXPERIENCES
Decades of Experience. In Their Words.
Hear from homeowners and professionals who have worked with Paul Johnson and experienced his approach to construction planning, communication, and documentation firsthand.
Paul is the most responsive and detail-oriented contractor my husband and I have ever worked with. He is professional, knowledgeable, and diligent. Pre-construction, Paul worked tirelessly with us… No detail was overlooked.
Jeff C
Homeowner
Joe C
Designer
Shyamie D
Attorney
Over the past 30 years, Mr. Johnson individually and with his company has been responsible for various projects on and in our house, the largest being a 3 story addition, incorporating among other things an interior elevator, a large new kitchen, a bathroom for full handicapped use. We found his sense of space, his careful approach to any project, and his close supervision of his team, extremely valuable, especially in today’s market, when many less competent and less honorable persons are in the business in which he is.
Almuth E.
Longtime Client
MOVE FORWARD, MORE PREPARED
What You Will Be Better Prepared to Do
After Working Through the Custom Home & High-Value Project Decision System™ You Will Be Better Prepared To:
Put What You Learn Into Action
- Use the Opportunity Window™ to address important decisions while flexibility is higher and changes are easier to make
- Pause at Decision Gates™ before consequential commitments involving property, design, contracts, changes, milestones, and payments
- Use the BYSA Decision Field Guide™, Owner’s Command Center™, and 12 essential project tools to organize and review important project information
- Apply the Payment Protection Triangle™ before releasing progress and final payments
- Follow the BYSA Project Action Plan™ from property and site decisions through design, construction, closeout, and long-term stewardship
Make More Informed Custom Home Decisions
- Evaluate property and site considerations more deliberately before major land or development commitments are made
- Establish clearer project priorities, budget parameters, and requirements before design moves too far
- Better understand how architects, builders, engineers, designers, and specialty professionals need to coordinate
- Evaluate pricing structures, contracts, allowances, contingencies, insurance, and other major financial considerations more systematically
- Recognize what should be clarified, documented, or verified before important milestones, concealed work, and financial commitments
The goal is to help you recognize the decisions that deserve closer attention while there is still time to address them—and give you a clearer process for moving the project forward.
What 's inside
The Complete Custom Home & High-Value Project Decision System™
Not simply a longer guide. A comprehensive, project-long decision system built for the expanded lifecycle and complexity of high-value projects.
From property evaluation and site due diligence through design, engineering, contracting, financial control, construction, final closeout, and long-term stewardship, each part of the system is designed to help you make more informed decisions before important commitments become harder or more expensive to change.
327
PAGE GUIDE
26
CHAPTERS
18
DECISION REVIEWS™
12
PROJECT TOOLS
5
DECISION FRAMEWORKS™
BUILT ON THE COMPLETE BYSA METHODOLOGY
Homeowner Essentials Foundation
Core BYSA decision methodology, frameworks, tools & action planning
Major Project Decision Depth
Deeper planning, design, financial control, construction & closeout principles
Custom Home & High-Value Application
Property and site due diligence, multidisciplinary team coordination, Decision Gates™, specialty systems, advanced project controls & long-term stewardship
3 DECISION ARCHITECTURE
Opportunity Window™, Decision Gates™ & BYSA Decision Filter™
Opportunity Window™
Decision Gates™
BYSA Decision Filter™
2 FOUNDATION APPLICATION
The Seven Foundations applied across a custom home
1 Core Guide
A 327-page, 26-chapter custom home decision system
6 FINANCIAL CONTROL
The Payment Protection Triangle™
1 Document
2 VERIFY
3 Pay
5 TOOLKIT
Guidance for 12 essential project tools
- Contractor Interview Worksheet™
- Contractor Comparison Matrix™
- Project Document Checklist™
- Budget Planning Worksheet™
- Scope Clarity Checklist
- Contract Protection Checklist
- Insurance Verification Guide
- Schedule Awareness Tracker
- Change Order Log™
- Meeting Notes™
- Payment Protection Triangle™ Worksheet
- Final Walkthrough Checklist™
4 DECISION FRAMEWORKS
Five practical decision frameworks
9 ACTION ROADMAP
The BYSA Project Action Plan™
8 PROJECT COMMAND CENTER
The Owner’s Command Center™
7 FIELD GUIDE
The BYSA Decision Field Guide™
Everything above, in one download.
BONUS — INCLUDED FREE
The Bonus Resource Collection
6 Submittal Log
7 Construction Allowances Guide
8 Construction Financial Documentation Guide
9 Sample Project Schedule
1 Sample Contract Terms
2 Partial Lien Release Sample Terms
3 Partial Final Lien Release Sample Terms
4 ACORD Insurance Declarations Sample
5 Product Submittal Sample
USE THE SYSTEM AT THE MOMENTS THAT MATTER
From Property Evaluation Through Final Closeout
1 | As You Evaluate the Property
BYSA Decision Field Guide™
Owner’s Command Center™
BYSA Project Action Plan™

2 | Before You Finalize the Property Purchase
Project Document Checklist™
Budget Planning Worksheet™
BYSA Decision Field Guide™

3 | Before Design Moves Too Far
Budget Planning Worksheet™
Meeting Notes™
Owner’s Command Center™

4 | As Plans, Selections, and Specialty Systems Are Coordinated
Product Submittal Sample
Submittal Log
Construction Allowances Guide
Schedule Awareness Tracker

5 | Before Final Pricing and Contract Commitments
Contractor Interview Worksheet™
Contractor Comparison Matrix™
Sample Contract Terms
ACORD Insurance Declarations Sample

6 | As Construction Progresses and Work Becomes Concealed
Change Order Log™
Meeting Notes™
BYSA Decision Field Guide™
Project Decision File

7 | Before You Release Progress Payments
Apply the Payment Protection Triangle™: Document. Verify. Pay
Payment Protection Triangle™ Worksheet
Construction Financial Documentation Guide
Partial Lien Release Sample Terms
Sample Project Schedule

8 | Before You Accept Completion and Transition Into Ownership
Final Walkthrough Checklist™
Final Lien Release Sample Terms
Owner’s Command Center™
BYSA Project Action Plan™

This is not a system you read once and forget.
Return to it before you purchase property, advance design, retain major professionals, sign
contracts, approve selections or changes, allow important work to be concealed, release
progress payments, accept completion, or make the next consequential project decision.
CUSTOM HOME & HIGH-VALUE PROJECT
Decision System™
$497
327 Pages
26-chapter custom home and high-value project decision system
18 Decision Reviews™
Quick-reference reviews for consequential project decisions
12 Project Tools
Practical tools for organizing decisions throughout the project
9 Bonus Resources
Sample documents and construction guides
Immediate Digital Access
Start using the system right away
A SMALL INVESTMENT ATTACHED TO A MUCH LARGER PROJECT
Spend More Time Reviewing the Decisions That Govern Your Custom Home
SUBSTANTIALLY MORE THAN THE SYSTEM ITSELF.
One Progress Payment Released Too Soon
Paying ahead of documented and verified progress can reduce your leverage while important work or documentation remains unresolved.
One Major Decision Coordinated Too Late
A specialty system, long-lead selection, or design requirement addressed too late can disrupt engineering, sequencing, budget, or completed work.
One Property Decision Made Too Early
A property purchased before key site conditions are understood can create costly design or development constraints later.

REAL CONSTRUCTION EXPERIENCE
Built From More Than 45 Years in Construction
Paul Johnson
BUT PAUL, I TRUST MY BUILDER AND DESIGN TEAM…
Good. You Should.
Trust + Documentation = Clearer Expectations
Conditions & Assumptions Shift
Site conditions, availability, pricing, schedules, and project assumptions can change as new information emerges.
Selections & Specifications Change
Products, finishes, quantities, specifications, and design details can evolve as the project progresses.
Teams & Roles Evolve
Project managers, consultants, subcontractors, and responsibilities may change during a long custom build.
Conversations Get Forgotten
What felt clear in a meeting may be remembered differently months later as the project moves forward.
Custom Home & High-Value Project is not built on suspicion.
It is built on preparation.
Documentation Protects Good Relationships From Bad Misunderstandings.
Contracts, drawings, approvals, payment records, and written decisions give you and your professional team a shared point of reference. Even experienced, well-intentioned people can remember the same decision differently months later.
My contractor already uses project management software. Why do I need this?
Before You Sign Anything™ isn’t project management software, it is designed to compliment your contractors management system.

YOUR CONTRACTOR'S SOFTWARE
Your contractor's software
JobTread, Procore, Buildertrend, and similar project management software are great tools for your contractor — managing schedules, tasks, documents, communications, crews, and day-to-day coordination.

YOUR ADVANTAGE
This system is designed to help you make the decisions that are yours to make: what to ask before you sign, what to look for in a change order, what to verify before approving a payment, and what to document along the way.
and they compliment each other.
Frequently Asked Questions
What exactly will I receive?
- The Seven Foundations of Project Protection™ applied throughout the custom-home lifecycle
- The Opportunity Window™
- Decision Gates™ for pausing before consequential commitments
- The Payment Protection Triangle™
- The BYSA Decision Filter™
- Five Decision Frameworks™
- Practical guidance for 12 Essential Project Tools™
- The BYSA Decision Field Guide™ with 18 quick-reference Decision Reviews™
- The Owner’s Command Center™ for organizing important project information
- The Project Decision File™ methodology for maintaining important decisions and documentation
- The BYSA Project Action Plan™, providing a chronological decision roadmap from early property and site decisions through construction, final payment, and closeout
When will I receive access?
Is this system specific to one state?
Is the Custom Home & High-Value Project Decision System™ right for my project?
How is this different from Major Remodel, and do I need both?
When is the best time to start using the system?
Can I still use the system if I already own the property, have started design, signed a contract, or begun construction?
Is this legal advice or a professional review of my project?
I already have an architect, builder, designer, engineer, or professional team. Do I still need this?
Do I need construction experience to use it?
Is this just an ebook?
Does this include direct access to Paul?
Does purchasing this system guarantee that my project will avoid problems?
What is included in the Bonus Resource Collection?
- Sample contract terms
- Partial lien release sample terms
- Final lien release sample terms
- ACORD insurance declarations sample
- Product submittal sample
- Submittal log
- Construction allowances guide
- Construction financial documentation guide
- Sample project schedule in Gantt chart format
One-time payment – Immediate digital access
A NOTE FROM PAUL
Better Projects Are Built One Informed Decision at a Time

Build Well !
Paul Johnson
Paul Johnson
Founder, Before You Sign Anything™